Lets hope they have a better run than the last batch, which expired virtually worthless(personally I realised my largest tax loss ever).
Before expiry we should have progress (if not completion) of the 1MW plant (and all associated mega-publicity), completion and mechanical stimulation of JOL1 (including reservoir development at shallower depths than those of HAB1/HAB3), spudding and possible completion/stimulation of SAV1 (and,less likely, the spudding of JOL2), and, of course, the all-important closed-loop circulation test between HAB1/HAB3 using the reduced-depth fracture system (further fracture systems are likely to exhibit higher temperatures due to greater depth).
An excellent period over which to issue options, in my opinion.
Cheers
- Forums
- ASX - By Stock
- gdyoa quoted and trading
Lets hope they have a better run than the last batch, which...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RNE (ASX) to my watchlist
|
|||||
Last
0.6¢ |
Change
0.001(20.0%) |
Mkt cap ! $4.356M |
Open | High | Low | Value | Volume |
0.6¢ | 0.6¢ | 0.6¢ | $61 | 11.07K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 1025823 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 7285048 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 1025823 | 0.005 |
18 | 10958067 | 0.004 |
15 | 5883191 | 0.003 |
11 | 5486586 | 0.002 |
3 | 3300004 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 7285048 | 11 |
0.007 | 2040520 | 3 |
0.008 | 3221791 | 4 |
0.009 | 2042509 | 3 |
0.010 | 6492765 | 4 |
Last trade - 16.10pm 09/07/2024 (20 minute delay) ? |
Featured News
RNE (ASX) Chart |