GED 3.23% 3.0¢ golden deeps limited.

GED chart, page-283

  1. 5,720 Posts.
    lightbulb Created with Sketch. 415
    we designed a WA iron ore plant to process 2.5Mt iron ore to produce 1.2Mt 61%Fe finished product per year. Total costed 8m.

    GED plans to initially treat only 0.8Mt ore per year via simple gravity separation, & SA labour cost is much lower than AUS (when in construction)

    that’s why I believe GED’s Capex should be less than $5m.

 
watchlist Created with Sketch. Add GED (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.