AAR 0.00% 8.1¢ astral resources nl

The RC program which commenced in September has been...

  1. 302 Posts.
    lightbulb Created with Sketch. 49
    The RC program which commenced in September has been substantially increased in size from 10,000m to over 27,500m of planned drilling, which reflects our confidence in the potential scale and significance of the Mandilla Gold Project.

    The return of sample results from the commercial laboratories has slowed with the turnaround time drifting out to 50 days.

    This is expected to be reduced over the December/January period, with a return to 14-21 day turnarounds expected in February as a result of additional laboratory capacity coming online.

    In the meantime, work has commenced on a maiden JORC 2012 Mineral Resource Estimate for the Mandilla Gold Project.


 
watchlist Created with Sketch. Add AAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.