NVA 3.23% 16.0¢ nova minerals limited

General Chat, page-7682

  1. 6,077 Posts.
    lightbulb Created with Sketch. 1479
    https://www.sec.gov/Archives/edgar/data/1852551/000149315224023437/formf-1a.htm#b_004

    There are some new disclosures in there eg. below. But there's a lot to read through...

    https://hotcopper.com.au/data/attachments/6241/6241251-f3830ebca1405c1510b38be7aa99a906.jpg
    Trundle - aero-magnetics pending.
    Surface Exploration Summary Table -
    Soil Samples: Train, Shoeshine, Muddy Creek, Shadow, Stibium stand out.
    Rock Samples: Similar to above. But of note: RPM had relatively few >1g/t samples, but a high peak value (356g/t). Shoeshine also has a standout peak value (1290g/t), but with relatively more 1g/t samples.

    https://hotcopper.com.au/data/attachments/6241/6241257-00125461333e67dff487d312b2a95280.jpg
    Progressing definition for MRE (M&I&I) and PFS (M&I in particular).

    https://hotcopper.com.au/data/attachments/6241/6241259-b638e8ca6633a352542da6689473d476.jpg
    RPM South is not the best part of RPM (half of it is deep under a mountain, and not the best grade), but if there's a connection to North or Valley, then that would benefit PFS a lot (since the connection zones fall within the prospective pit designs, which is currently considered to be waste in the calculations).

    I think North Uphill would be high priority too, as it's easier/quicker to reach M&I status, and likely better grade and with similar benefits in PFS. Any North-South / Valley-South connection zones would take more time to prove up.

    Cathedral gets a mention, but is on the back burner, unless we had funds for an excess of rigs.

    https://hotcopper.com.au/data/attachments/6241/6241262-d096f19bfae9139b2297fd8c588ef42f.jpg
    I think ASX allows project-wide resources (to unrealistic depths eg. the portion of RPM South under the mountain), but US requires in-pit resources in the table. So I feel like US 'resources' are half way between ASX 'resources' and ASX 'reserves'. But, that doesn't mean that the pits are definitely realistic. Eg. they show a Cathedral pit, which SS2 never showed, and it goes deeper than Korbel's while having lower grade.
 
watchlist Created with Sketch. Add NVA (ASX) to my watchlist
(20min delay)
Last
16.0¢
Change
0.005(3.23%)
Mkt cap ! $38.96M
Open High Low Value Volume
15.5¢ 16.0¢ 15.5¢ $40.76K 260.7K

Buyers (Bids)

No. Vol. Price($)
4 50778 15.5¢
 

Sellers (Offers)

Price($) Vol. No.
17.0¢ 20036 1
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
NVA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.