The Amungee 2H (A2H) development well in Tamboran’s 38.75 per cent owned and operated exploration permit EP 98 spudded on 10 November 2022.Tamboran will drill the vertical and build section to a depth of approximately 2,450-metres, prior to drilling the 1,000-metre horizontal section within the primary target of the Mid-Velkerri “B” Shale.
The Maverick 1V (M1V) vertical well, drilled within Tamboran’s 100 per cent owned and operated Beetaloo Basin permit, EP 136, has safely reached a total depth (TD) of 3,050 metres. TD was reached in 18.3 days, representing a 54 per cent reduction in drilling time compared to other near-field vertical sections drilled deeper than 2,500 metres in the Beetaloo Basin.
Must be getting close.
- Forums
- ASX - By Stock
- TBN
- General Chatter
General Chatter, page-53
-
- There are more pages in this discussion • 138 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TBN (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.0¢ |
Change
0.005(3.45%) |
Mkt cap ! $309.0M |
Open | High | Low | Value | Volume |
15.0¢ | 15.0¢ | 15.0¢ | $33.61K | 224.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
23 | 1449963 | 14.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.0¢ | 198065 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
23 | 1449963 | 0.145 |
11 | 1176376 | 0.140 |
3 | 103000 | 0.135 |
4 | 58592 | 0.130 |
3 | 103002 | 0.125 |
Price($) | Vol. | No. |
---|---|---|
0.155 | 319325 | 5 |
0.160 | 386716 | 4 |
0.165 | 255000 | 4 |
0.170 | 461291 | 3 |
0.175 | 80000 | 1 |
Last trade - 11.28am 04/10/2024 (20 minute delay) ? |
Featured News
TBN (ASX) Chart |