Because the commerciality of the project is not priced in at 7c. If we can flow at commercial levels from a vertical well, we know that the project is viable and money is to be made.
The second well will probably perform better, since it is targetting larger areas in every zone and therefore gas will flow to surface at higher rates.
Not an expert, but it is my understanding that if appraisal wells are drilled wide enough to allow future production, appraisal wells can be converted in production wells. The can do this through installing production tubing, casing, and other equipment.
- Forums
- ASX - By Stock
- EXR
- General chit chat thread.
General chit chat thread., page-3299
-
-
- There are more pages in this discussion • 814 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $197.4M |
Open | High | Low | Value | Volume |
17.0¢ | 17.0¢ | 16.0¢ | $254.5K | 1.534M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 316607 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 106270 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 316607 | 0.165 |
8 | 231589 | 0.160 |
4 | 241166 | 0.155 |
13 | 554770 | 0.150 |
7 | 539692 | 0.145 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 100388 | 6 |
0.175 | 353986 | 7 |
0.180 | 690855 | 13 |
0.185 | 68701 | 3 |
0.190 | 199892 | 9 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
EXR (ASX) Chart |