I would think they fished it out before leaving the well, hence taking time to remove it and blowing out the schedule. If they couldn't fish it they will drill through it, if they can't to that then they would sidetrack. Bridge plugs are made to be drilled through so by logic the setting tools would too. Pretty sure you wouldn't leave the well with a stuck tool inside. I thought in his interview he said the well had be left in a safe condition, could be wrong though.
- Forums
- ASX - By Stock
- General chit chat thread.
I would think they fished it out before leaving the well, hence...
-
- There are more pages in this discussion • 446 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $130.4M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 15000 | 12.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.0¢ | 190000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 15000 | 0.120 |
4 | 24632 | 0.115 |
13 | 853000 | 0.110 |
9 | 447151 | 0.105 |
15 | 764050 | 0.100 |
Price($) | Vol. | No. |
---|---|---|
0.110 | 190000 | 2 |
0.120 | 138607 | 4 |
0.125 | 115000 | 2 |
0.130 | 280555 | 4 |
0.135 | 394909 | 5 |
Last trade - 16.12pm 24/07/2024 (20 minute delay) ? |
Featured News
EXR (ASX) Chart |
Day chart unavailable
The Watchlist
1CG
ONE CLICK GROUP LIMITED
Mark Waller, MD
Mark Waller
MD
Previous Video
Next Video
SPONSORED BY The Market Online