EXR 4.35% 11.0¢ elixir energy limited

Because the commerciality of the project is not priced in at 7c....

  1. 614 Posts.
    lightbulb Created with Sketch. 571
    Because the commerciality of the project is not priced in at 7c. If we can flow at commercial levels from a vertical well, we know that the project is viable and money is to be made.

    The second well will probably perform better, since it is targetting larger areas in every zone and therefore gas will flow to surface at higher rates.

    Not an expert, but it is my understanding that if appraisal wells are drilled wide enough to allow future production, appraisal wells can be converted in production wells. The can do this through installing production tubing, casing, and other equipment.
 
watchlist Created with Sketch. Add EXR (ASX) to my watchlist
(20min delay)
Last
11.0¢
Change
-0.005(4.35%)
Mkt cap ! $124.7M
Open High Low Value Volume
11.5¢ 12.0¢ 11.0¢ $183.3K 1.603M

Buyers (Bids)

No. Vol. Price($)
33 1158406 11.0¢
 

Sellers (Offers)

Price($) Vol. No.
11.5¢ 50000 1
View Market Depth
Last trade - 16.10pm 13/05/2024 (20 minute delay) ?
Last
11.0¢
  Change
-0.005 ( 6.38 %)
Open High Low Volume
11.5¢ 12.0¢ 11.0¢ 1009339
Last updated 15.47pm 13/05/2024 ?
EXR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.