Because the commerciality of the project is not priced in at 7c. If we can flow at commercial levels from a vertical well, we know that the project is viable and money is to be made.
The second well will probably perform better, since it is targetting larger areas in every zone and therefore gas will flow to surface at higher rates.
Not an expert, but it is my understanding that if appraisal wells are drilled wide enough to allow future production, appraisal wells can be converted in production wells. The can do this through installing production tubing, casing, and other equipment.
- Forums
- ASX - By Stock
- General chit chat thread.
Because the commerciality of the project is not priced in at 7c....
-
- There are more pages in this discussion • 207 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.0¢ |
Change
-0.005(4.35%) |
Mkt cap ! $124.7M |
Open | High | Low | Value | Volume |
11.5¢ | 12.0¢ | 11.0¢ | $183.3K | 1.603M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
33 | 1158406 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 50000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
33 | 1158406 | 0.110 |
11 | 2096569 | 0.105 |
35 | 1682431 | 0.100 |
1 | 6000 | 0.099 |
1 | 50000 | 0.097 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 50000 | 1 |
0.120 | 394261 | 10 |
0.125 | 46450 | 4 |
0.130 | 66223 | 2 |
0.135 | 160000 | 5 |
Last trade - 16.10pm 13/05/2024 (20 minute delay) ? |
|
|||||
Last
11.0¢ |
  |
Change
-0.005 ( 6.38 %) |
|||
Open | High | Low | Volume | ||
11.5¢ | 12.0¢ | 11.0¢ | 1009339 | ||
Last updated 15.47pm 13/05/2024 ? |
Featured News
EXR (ASX) Chart |
The Watchlist
MGU
MAGNUM MINING AND EXPLORATION LIMITED
Neil Goodman, MD
Neil Goodman
MD
SPONSORED BY The Market Online