AGY 0.00% 3.5¢ argosy minerals limited

General Discussion AGY, page-11199

  1. 106 Posts.
    lightbulb Created with Sketch. 97
    Environmental Impact Assessment (EIA) approval for lithium brine operations is needed to ensure that potential negative impacts on the environment, including air and water pollution, are minimized. However, obtaining EIA approval can take a long time, often several years.

    There
    are a number of factors that contribute to the lengthy process of securing EIA approval for lithium brine operations. One of the main reasons is that the assessment process involves many different stakeholders, including local and state governments, environmental groups, and community organizations. Each of these groups must be consulted, their concerns addressed, and any necessary adjustments made in order to gain approval. In addition, conducting an EIA requires a substantial amount of research and analysis, which can be time-consuming.

    The
    complexity of lithium brine operations is also a significant factor in the length of time it takes to obtain approval. Lithium is typically extracted from brine that has been sitting beneath the surface for millions of years, meaning that the entire process of extraction must be carefully considered to prevent causing further damage to the environment. The complexity of brine operations, as well as the possibility of adverse impacts on the environment, means that more time is required to fully understand how the operations will affect the environment.

    Finally
    , obtaining EIA approval also involves the overview of experts who specialize in environmental conservation and protection. Such professionals are tasked with providing an objective analysis on the potential impacts of the brine operation on the environment, which can take a significant amount of time. As such, environmental experts must be consulted and their input incorporated into the final decision regarding the approval of the project.In conclusion, obtaining Environmental Impact Assessment (EIA) approval for lithium brine operations can take a long time due to several factors.

    These
    include the need to consult numerous stakeholders, the complexity of the brine operations, and the necessity of relying on the expertise of environmental specialists. Although the long wait can be frustrating, it is important to ensure that the necessary steps are taken to minimize the potential for adverse environmental impacts.
 
watchlist Created with Sketch. Add AGY (ASX) to my watchlist
(20min delay)
Last
3.5¢
Change
0.000(0.00%)
Mkt cap ! $50.95M
Open High Low Value Volume
3.5¢ 3.6¢ 3.5¢ $9.454K 270.0K

Buyers (Bids)

No. Vol. Price($)
8 1030230 3.5¢
 

Sellers (Offers)

Price($) Vol. No.
3.6¢ 639918 8
View Market Depth
Last trade - 12.26pm 15/11/2024 (20 minute delay) ?
AGY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.