You may of missed it in my post but I said there is nothing wrong with hard processes taking the required time what I did point out that 14 months delay getting an under designed filter press to work is absolutely unacceptable from an engineering standpoint.
It was preventing the rest of the flow sheet from being commissioned at scale, it should of had everything thrown at it and possibly ripped out and replaced.
We could've flown engineers and trades over from Australia, this thing has cost us a year worth of revenue plus idle staff cost. Plus dilution costs.
Let that sink in.
imo
dyor
- Forums
- ASX - By Stock
- AGY
- General Discussion AGY
General Discussion AGY, page-22809
-
-
- There are more pages in this discussion • 101 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.2¢ |
Change
0.011(13.6%) |
Mkt cap ! $133.9M |
Open | High | Low | Value | Volume |
8.4¢ | 9.6¢ | 8.3¢ | $761.7K | 8.626M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 14047 | 9.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.4¢ | 10000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 14047 | 0.092 |
2 | 60000 | 0.091 |
1 | 9034 | 0.090 |
2 | 111235 | 0.089 |
1 | 7500 | 0.087 |
Price($) | Vol. | No. |
---|---|---|
0.094 | 10000 | 1 |
0.095 | 153809 | 2 |
0.096 | 20000 | 1 |
0.097 | 53000 | 2 |
0.099 | 500000 | 1 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
AGY (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online