I have been accumulating since 2016 and I am not distracted from the fundamentals by the fluctuations in share price.
I readily accept that issues and delays occur, and recognise that plans, opportunities and circumstances change along the pathway of development.
When will AGY “come good again”…?
That’s anyone’s guess; imo the major catalyst required is a funding solution for the expansion.
Only time will tell what that looks like and when it happens.
In the meantime, I wait….and I don’t buy into the sky is falling narrative. We’ll see.
Mid 2017:
- <$4M cash
- includes circa $3.2M raised via recent placement and spp at 7.3c
- MRE: yet to be established
- tenements: 1289 ha
- no permits for onsite plant operations (targeting a 1000-1500 tpa plant at that time)
- industrial-scale pilot plant (off site) yet to be constructed, warehouse site secured
- no carbonate produced
- 1.25 ha ponds constructed
- Li2CO3 FOB SA circa $12k/t iirc
- AGY sp: circa 8c
- AGY market cap: circa $60M
- next key steps: construction of off-site industrial-scale pilot plant; process brine, demonstrate process via Li2CO3 production
Late 2020:
- circa $3M cash
- MRE: 245kt, indicating potential for 10ktpa for 16.5 years production
- tenements: 2794 ha
- no expansion permits for operations beyond 2ktpa
- 2ktpa plant yet to be funded; construction yet to begin
- circa 30t carbonate produced from off-site industrial-scale pilot plant
- 38 ha ponds constructed
- Li2CO3 CIF North Asia <$7k/t
- AGY sp: circa 7-8c
- AGY market cap: circa $75M
- next key steps: secure funding to commence construction of 2ktpa plant
- construction of 10ktpa expansion to commence: absolute best possible case circa 18 months..?
Mid 2024:
- circa $12M cash
- strategic investment by ATL: USD$5M
- MRE: 687kt, indicating potential for 12ktpa for 42 years production, or 24ktpa for 22 years
- tenements: 8606 ha (pending formal granting of 5813 ha)
- expansion permits granted for for 12ktpa operations
- 2ktpa plant built and largely commissioned, market conditions drive pause of refinement and ramp-up
- circa 80t of carbonate stockpiled, produced from 2ktpa plant commissioning works
- 20t of carb from 2ktpa plant sold to Korean customer; also, ATL is performing product testing and qualification
- circa 58 ha of operational evaporation ponds
- Li2CO3 CIF North Asia: circa $12k/t-$13k/t
- AGY sp: circa 4c
- AGY market cap: circa $60M
- next key steps: complete engineering to get 10ktpa expansion to construction-ready status; secure funding to commence construction of 10ktpa expansion
- construction of 10ktpa expansion to commence: absolute best possible case: DYOR
Read those market cap figures again. LOL.
imo
Dyor
- Forums
- ASX - By Stock
- General Discussion AGY
I have been accumulating since 2016 and I am not distracted from...
-
- There are more pages in this discussion • 160 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $59.69M |
Open | High | Low | Value | Volume |
4.1¢ | 4.1¢ | 4.0¢ | $56.28K | 1.374M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 2303366 | 4.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.2¢ | 751951 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 2303366 | 0.040 |
12 | 3099266 | 0.039 |
14 | 658231 | 0.038 |
6 | 284040 | 0.037 |
3 | 487755 | 0.036 |
Price($) | Vol. | No. |
---|---|---|
0.042 | 701951 | 4 |
0.043 | 539390 | 2 |
0.044 | 719302 | 5 |
0.045 | 444048 | 7 |
0.046 | 300000 | 2 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
AGY (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online