Yes and no, I think they will build all the ponds given how far they've come but I can certainly see an option to say not complete #6 & #7 if lower flow rates from less throughput allows slower pumping and thus more evaporation before it reaches pond 5. Only a short pipe-length to change later on in that case.
They'd still need to build ponds 8 and 9 though, so probably where they're at they'll simply build them all and be done with it. That way the expansion to higher throughput involves less parts and also no wait time for evaporation when the time comes.
- Forums
- ASX - By Stock
- GLN
- General Discussion Banter GLN
General Discussion Banter GLN, page-15854
-
- There are more pages in this discussion • 272 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GLN (ASX) to my watchlist
(20min delay)
|
|||||
Last
13.5¢ |
Change
0.010(8.00%) |
Mkt cap ! $77.48M |
Open | High | Low | Value | Volume |
13.0¢ | 13.5¢ | 12.0¢ | $609.4K | 4.788M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 22000 | 13.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.5¢ | 356857 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 22000 | 0.130 |
13 | 815000 | 0.125 |
38 | 2213905 | 0.120 |
16 | 3873958 | 0.115 |
34 | 1844549 | 0.110 |
Price($) | Vol. | No. |
---|---|---|
0.135 | 356857 | 7 |
0.140 | 548333 | 9 |
0.145 | 672266 | 9 |
0.150 | 380591 | 6 |
0.155 | 339563 | 9 |
Last trade - 16.10pm 16/10/2024 (20 minute delay) ? |
Featured News
GLN (ASX) Chart |