GLN 8.00% 13.5¢ galan lithium limited

According to DFS1 the first two years of output from stage 1 is...

  1. 571 Posts.
    lightbulb Created with Sketch. 240
    According to DFS1 the first two years of output from stage 1 is 4250T each year , followed by 5400 in years 3-5, as described -

    “The operation of the evaporation ponds for producing lithium chloride concentrate has a long-term Lirecovery of 66.7%, but in the first two years, due to the accumulation of operational ‘working capital’(salt and brine inventory in ponds) during the ramp-up period, the Li recovery is 52.7%, which explainsthe lower production of 4,249 tonnes of recoverable LCE in years 2025 and 2026.”

    So, does that mean all ponds are built currently and output is held at 4kT/pa or some number less are built and somehow output recoverable output is 67% straight up ?
 
watchlist Created with Sketch. Add GLN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.