According to DFS1 the first two years of output from stage 1 is 4250T each year , followed by 5400 in years 3-5, as described -
“The operation of the evaporation ponds for producing lithium chloride concentrate has a long-term Lirecovery of 66.7%, but in the first two years, due to the accumulation of operational ‘working capital’(salt and brine inventory in ponds) during the ramp-up period, the Li recovery is 52.7%, which explainsthe lower production of 4,249 tonnes of recoverable LCE in years 2025 and 2026.”
So, does that mean all ponds are built currently and output is held at 4kT/pa or some number less are built and somehow output recoverable output is 67% straight up ?
- Forums
- ASX - By Stock
- General Discussion Banter GLN
According to DFS1 the first two years of output from stage 1 is...
-
-
- There are more pages in this discussion • 269 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GLN (ASX) to my watchlist
(20min delay)
|
|||||
Last
13.5¢ |
Change
0.010(8.00%) |
Mkt cap ! $77.48M |
Open | High | Low | Value | Volume |
13.0¢ | 13.5¢ | 12.0¢ | $475.7K | 3.762M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 184669 | 13.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.5¢ | 400647 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 101977 | 0.130 |
22 | 601203 | 0.125 |
39 | 2000355 | 0.120 |
15 | 3785674 | 0.115 |
35 | 1709608 | 0.110 |
Price($) | Vol. | No. |
---|---|---|
0.135 | 300647 | 5 |
0.140 | 563438 | 11 |
0.145 | 772818 | 11 |
0.150 | 402725 | 7 |
0.155 | 339563 | 9 |
Last trade - 14.36pm 16/10/2024 (20 minute delay) ? |
Featured News
GLN (ASX) Chart |