We'll still need mains unless that thing has battery storage which doesn't look the case and wouldn't make sense for its purpose.
One possibility is that we connect to the other side of their feed in connector which may shorten our run. Will depend on what size they budgeted for in their project I doubt they liaised with AGY or other producers. Another problem that would occur is if for example they wanted to maintain or had a problem with their transformer we would have to shut down our plant. It could be eliminated with switching at cost born by us.
JZ just not closing peoples optimism down doubt we'll use it most likely straight to grid.
- Forums
- ASX - By Stock
- General Discussion of AGY
We'll still need mains unless that thing has battery storage...
-
-
- There are more pages in this discussion • 3,659 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.8¢ |
Change
0.002(5.56%) |
Mkt cap ! $55.32M |
Open | High | Low | Value | Volume |
3.7¢ | 4.0¢ | 3.7¢ | $271.6K | 7.042M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 1174965 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 1272049 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 927072 | 0.038 |
5 | 1125500 | 0.037 |
17 | 1599933 | 0.036 |
24 | 2420960 | 0.035 |
6 | 1297499 | 0.034 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 1272049 | 10 |
0.041 | 606346 | 5 |
0.042 | 1177717 | 9 |
0.043 | 1742500 | 3 |
0.044 | 700350 | 6 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
AGY (ASX) Chart |