I think you'll find the reference to the smaller ponds being used to "store" concentrated brine from the larger ponds relates to the way AGY process their brine, ie they start by filling the large top ponds located on higher ground, and then progressively move the concentrated brine down into the smaller ponds. The below photo from the recent AGM presentation helps to see how the ponds are terraced down the slope.
I assume AGY have developed this pond design in order to maximise and efficiently manage the evaporation process/timeframe.
- Forums
- ASX - By Stock
- AGY
- General Discussion of AGY
General Discussion of AGY, page-53
-
- There are more pages in this discussion • 5,570 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
12.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $175.5M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 29748 | 13.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.5¢ | 17749 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 29748 | 0.130 |
24 | 785029 | 0.125 |
32 | 1085938 | 0.120 |
15 | 541369 | 0.115 |
14 | 680049 | 0.110 |
Price($) | Vol. | No. |
---|---|---|
0.125 | 17749 | 3 |
0.130 | 215000 | 4 |
0.135 | 463788 | 11 |
0.140 | 716686 | 13 |
0.145 | 545490 | 11 |
Last trade - 09.19am 02/05/2024 (20 minute delay) ? |
Featured News
AGY (ASX) Chart |
Day chart unavailable
The Watchlist
BPH
BPH ENERGY LTD
David Breeze, MD & Executive Chairman
David Breeze
MD & Executive Chairman
SPONSORED BY The Market Online