RR1 0.00% 1.4¢ reach resources limited

Always Nice to Remind Ourselves of the Highlights Phase 1...

  1. 179 Posts.
    lightbulb Created with Sketch. 23

    Always Nice to Remind Ourselves of the Highlights


    • Phase 1 drilling has intersected multiple thick, stacked pegmatites at the Bonzer Prospect within the Company’s 100%‐owned Morrissey Hill Lithium Project, Yinnetharra WA.

    • Target pegmatite units have been intersected in every hole drilled, with individual drill intercepts up to 30m in length.

    • RC drilling has been designed to test near surface extents of outcropping pegmatites while deeper diamond holes are testing for continuity at depth.

    • Diamond drill cores show multiple pegmatite intersections which is highly encouraging and consistent with the geology at neighbouring Delta Lithium’s (ASX: DLI) Malinda Lithium Project.

    • First round of assays eagerly expected in early October 2023.

    • Following encouraging visual expressions1 , the Company is undertaking additional diamond drilling, prior to the commencement of cattle mustering activities in the area.

      **** And Next Door DLI ASX ANNOUNCEMENT 23 J u n e 2 0 2 3 ****


      https://hotcopper.com.au/data/attachments/5651/5651702-33850b1ab9950b201927977f74b3c721.jpg

      https://hotcopper.com.au/data/attachments/5651/5651688-66e9a8e2565f7faf29cadd492292c748.jpg

 
watchlist Created with Sketch. Add RR1 (ASX) to my watchlist
(20min delay)
Last
1.4¢
Change
0.000(0.00%)
Mkt cap ! $12.24M
Open High Low Value Volume
1.4¢ 1.4¢ 1.3¢ $8.292K 610.0K

Buyers (Bids)

No. Vol. Price($)
4 422862 1.3¢
 

Sellers (Offers)

Price($) Vol. No.
1.4¢ 141572 2
View Market Depth
Last trade - 16.10pm 19/07/2024 (20 minute delay) ?
RR1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.