SYA 2.94% 3.3¢ sayona mining limited

General Discussion Topics, page-103497

  1. 6,018 Posts.
    lightbulb Created with Sketch. 686
    Can you elaborate on how you are getting USD85m per shipment. First shipment is in July I accept that. Post that, there is only 5 months remaining.

    Let’s be lenient on SYA and your estimate and say 6 months. Last reported production run rate was around 7500t/month which is around 40% nameplate. Let’s be generous and assume 70% run rate immediately magically - 13180t/month.

    So assuming a shipment every 2 months, each shipment will be 26360t. 13180 will go to PLL at USD900/t and 13180 will go to another party at spot so say USD4500/t. That’s only USD70m based on very generous assumptions. Giving SYA an extra month and also assuming a run rate most won’t achieve in half a year.

    I think you are being overly optimistic.
    Last edited by Charterrierist: 14/06/23
 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.