The important axis on these has been cut off, being Supply Risk. The reasons for them being Critical has to do work the technology aspects from the perspective of DOE.
For lithium, the Supply Risk in the near term is medium, and in the medium term is high.
link to original PDF can be found here:
https://www.energy.gov/sites/default/files/2023-07/doe-critical-material-assessment_07312023.pdf
- Forums
- ASX - By Stock
- General Discussion Topics
The important axis on these has been cut off, being Supply Risk....
-
- There are more pages in this discussion • 32,135 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SYA (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
-0.002(7.14%) |
Mkt cap ! $267.6M |
Open | High | Low | Value | Volume |
2.8¢ | 2.8¢ | 2.6¢ | $286.5K | 10.70M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
25 | 7497011 | 2.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.7¢ | 5105482 | 13 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
19 | 7195085 | 0.026 |
32 | 8211284 | 0.025 |
27 | 6838572 | 0.024 |
21 | 4765707 | 0.023 |
36 | 4413692 | 0.022 |
Price($) | Vol. | No. |
---|---|---|
0.027 | 3812968 | 7 |
0.028 | 3987299 | 29 |
0.029 | 9469476 | 19 |
0.030 | 15485234 | 30 |
0.031 | 2789626 | 6 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
SYA (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online