SYA 3.13% 3.3¢ sayona mining limited

General Discussion Topics, page-118886

  1. 17,299 Posts.
    lightbulb Created with Sketch. 1094
    NAL has a two or three year wait before it can produce LiCO, (if that is even allowed to happen).

    It may be worth doing a feasibility study to explore what it would take to produce lithium sulphate at NAL.

    I suspect the still employed engineers and metallurgists responsible for designing and building the existing half built plant would know already.

    The benefit of producing lithium sulphate is that it can feed into the production of LiCO, LiOH or lithium metal for solid state batteries.

    So upgrading NAL to produce Li2SO, would not be wasted whichever direction they headed in the future.
 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
(20min delay)
Last
3.3¢
Change
0.001(3.13%)
Mkt cap ! $339.6M
Open High Low Value Volume
3.3¢ 3.4¢ 3.2¢ $723.3K 21.93M

Buyers (Bids)

No. Vol. Price($)
182 43325841 3.2¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 2030189 8
View Market Depth
Last trade - 16.10pm 11/07/2024 (20 minute delay) ?
SYA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.