SYA 0.00% 3.5¢ sayona mining limited

General Discussion Topics, page-138563

  1. 3,464 Posts.
    lightbulb Created with Sketch. 652
    the altura project suffered because banks recalled loans at the low of the last lithium cycle , the mining side of project was going well , if the banks hadn’t recalled loans they would have been a very successful operation, plenty of people use this to blame JB but the lithium market cycle was the main reason for there collapse something which JB has so far prevented from happening with sya
 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
(20min delay)
Last
3.5¢
Change
0.000(0.00%)
Mkt cap ! $360.2M
Open High Low Value Volume
3.4¢ 3.5¢ 3.4¢ $1.607M 46.41M

Buyers (Bids)

No. Vol. Price($)
23 4668541 3.4¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 2167024 9
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
SYA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.