SYA 5.26% 3.6¢ sayona mining limited

the altura project suffered because banks recalled loans at the...

  1. 3,468 Posts.
    lightbulb Created with Sketch. 656
    the altura project suffered because banks recalled loans at the low of the last lithium cycle , the mining side of project was going well , if the banks hadn’t recalled loans they would have been a very successful operation, plenty of people use this to blame JB but the lithium market cycle was the main reason for there collapse something which JB has so far prevented from happening with sya
 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
(20min delay)
Last
3.6¢
Change
-0.002(5.26%)
Mkt cap ! $370.5M
Open High Low Value Volume
3.7¢ 3.7¢ 3.5¢ $2.158M 59.44M

Buyers (Bids)

No. Vol. Price($)
6 2625000 3.6¢
 

Sellers (Offers)

Price($) Vol. No.
3.7¢ 5881377 21
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
SYA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.