SYA 2.33% 4.2¢ sayona mining limited

the altura project suffered because banks recalled loans at the...

  1. 3,341 Posts.
    lightbulb Created with Sketch. 614
    the altura project suffered because banks recalled loans at the low of the last lithium cycle , the mining side of project was going well , if the banks hadn’t recalled loans they would have been a very successful operation, plenty of people use this to blame JB but the lithium market cycle was the main reason for there collapse something which JB has so far prevented from happening with sya
 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
(20min delay)
Last
4.2¢
Change
-0.001(2.33%)
Mkt cap ! $432.3M
Open High Low Value Volume
4.2¢ 4.3¢ 4.1¢ $1.422M 33.87M

Buyers (Bids)

No. Vol. Price($)
4 446998 4.2¢
 

Sellers (Offers)

Price($) Vol. No.
4.3¢ 5888258 20
View Market Depth
Last trade - 16.10pm 24/05/2024 (20 minute delay) ?
Last
4.3¢
  Change
-0.001 ( 1.62 %)
Open High Low Volume
4.2¢ 4.3¢ 4.1¢ 22039027
Last updated 15.59pm 24/05/2024 ?
SYA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.