Reaching Nameplate 226KT/year @ 5.4 % grade= 203 KT/year 6.0 % Spod equivalent which equates to PLL 113KT/year and JV 90KT/year....Assuming AISC=USD700 per ton and Spod 6% pricing USD1130 per ton----That will give PLL OT 900-700=USD 200 per ton profit of 113,000 Tons and Joint Venture=USD430 per ton profit of 90,000--------Profit PLL OT 113000x200=USD 22.6M and Joint Venture (JV) 90000x430=USD38.7M------TOTAL PROFIT=38.7+22.6=USD61.3M per annum which is 75% will go to SYA=61.3x.75=USD46 M per annum-----SYA SOI is 10.2B therefore SYA ROI per Share is 46,000,000/10,200,000,000= USD.0045 or AUD .007 at .67 AUD to USD----Yes SYA ROI is .007 reaching Name Plate of 203KT 6%Spod (226KT 5.4% grade) USD1130 per ton------An investor eying ROI of 5% return equates to a SP SYAQ alone is=.007/.05=.14C ...
- Forums
- ASX - By Stock
- General Discussion Topics
Reaching Nameplate 226KT/year @ 5.4 % grade= 203 KT/year 6.0 %...
-
- There are more pages in this discussion • 4,371 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SYA (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.3¢ |
Change
-0.001(4.17%) |
Mkt cap ! $236.7M |
Open | High | Low | Value | Volume |
2.4¢ | 2.5¢ | 2.3¢ | $337.1K | 14.25M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
64 | 14483458 | 2.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 5943785 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
56 | 12541200 | 0.023 |
31 | 5326227 | 0.022 |
21 | 3346340 | 0.021 |
44 | 8668149 | 0.020 |
6 | 6001643 | 0.019 |
Price($) | Vol. | No. |
---|---|---|
0.024 | 3918148 | 9 |
0.025 | 5658675 | 33 |
0.026 | 7270766 | 15 |
0.027 | 7467011 | 26 |
0.028 | 4886055 | 18 |
Last trade - 16.10pm 06/09/2024 (20 minute delay) ? |
Featured News
SYA (ASX) Chart |