“Sayona will implement a ROM (run-of-mine) ore stockpile management system whereby diluted material, lower grade ore and higher-grade feed will be segregated and managed via a stockpile management plan to ensure consistent feed to the plant. This will allow for production campaigns of similar material, providing the concentrate plant sufficient feed stock to maximise product recovery and grade.
Sayona anticipates increased concentrator mill throughput, from 3,800 tonnes per day (tpd) to 4,200 tpd to produce a 6% Li2O spodumene concentrate.”
https://sayonamining.com.au/projects/nal-project/
If the ROM stockpile was 150,000 tonne in December 2022, how much bigger will it be on 01 July 2023?
- Forums
- ASX - By Stock
- General Discussion Topics
“Sayona will implement a ROM (run-of-mine) ore stockpile...
-
- There are more pages in this discussion • 55,033 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SYA (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $298.5M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 22857 | 3.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.9¢ | 4311027 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 22857 | 0.035 |
1 | 156250 | 0.032 |
3 | 2500000 | 0.031 |
12 | 3335757 | 0.030 |
20 | 8141296 | 0.029 |
Price($) | Vol. | No. |
---|---|---|
0.029 | 4336027 | 7 |
0.030 | 3946079 | 22 |
0.031 | 15611004 | 26 |
0.032 | 11219173 | 28 |
0.033 | 3198138 | 15 |
Last trade - 09.40am 27/09/2024 (20 minute delay) ? |
Featured News
SYA (ASX) Chart |
Day chart unavailable