To have produced 15000 tone of concentrate since February, NAL must have averaged somewhere around 200 tonne per day of output.
In March we were told that 70 tonne had been stockpiled.
For that to have jumped to 15,000 tonne, the daily rate of production must have increased (I am guessing to 400 tpd plus).
Nameplate of 226,000 tonne per year will require output of 619 tpd.
Increasing the throughput to between 5000 to 5500 per day would bump up output to somewhere around 900 tpd.
These are ballpark figures only, feel free to point out where I may have gone wrong.
- Forums
- ASX - By Stock
- SYA
- General Discussion Topics
General Discussion Topics, page-99604
-
- There are more pages in this discussion • 45,599 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SYA (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.1¢ |
Change
-0.001(3.13%) |
Mkt cap ! $319.0M |
Open | High | Low | Value | Volume |
3.3¢ | 3.3¢ | 3.1¢ | $930.1K | 29.50M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
30 | 7440600 | 3.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.2¢ | 7151550 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
28 | 7340600 | 0.031 |
81 | 19166158 | 0.030 |
25 | 7992021 | 0.029 |
34 | 11077632 | 0.028 |
13 | 4163687 | 0.027 |
Price($) | Vol. | No. |
---|---|---|
0.032 | 7151550 | 9 |
0.033 | 7716305 | 14 |
0.034 | 19373487 | 23 |
0.035 | 8768247 | 25 |
0.036 | 10072345 | 34 |
Last trade - 16.10pm 06/11/2024 (20 minute delay) ? |
Featured News
SYA (ASX) Chart |