SYA 5.88% 3.2¢ sayona mining limited

Thanks, can you please show me where the second OT at $900 is in...

  1. 2,432 Posts.
    lightbulb Created with Sketch. 752
    Thanks, can you please show me where the second OT at $900 is in writing after the Carbonate Plant is in operation? My reading of the DFS (last bullet point) is that forecast contract prices will be used from 2027 onward. Ta
    Last edited by malibu_tan: 21/05/23
 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.