SYA 2.70% 3.6¢ sayona mining limited

Ramp up costs are included in production costs. Major ticket...

  1. 10,436 Posts.
    lightbulb Created with Sketch. 1340
    Ramp up costs are included in production costs. Major ticket items are now paid for and insitu so increase in production equals more money.
 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
(20min delay)
Last
3.6¢
Change
-0.001(2.70%)
Mkt cap ! $370.5M
Open High Low Value Volume
3.7¢ 3.8¢ 3.6¢ $827.3K 22.47M

Buyers (Bids)

No. Vol. Price($)
49 7146787 3.6¢
 

Sellers (Offers)

Price($) Vol. No.
3.7¢ 1722440 3
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
3.7¢
  Change
-0.001 ( 1.60 %)
Open High Low Volume
3.7¢ 3.8¢ 3.7¢ 11169403
Last updated 15.57pm 14/06/2024 ?
SYA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.