The AAM will involve C4V tech and its design of plant/equipment so this deadline is not agreed out of the thin air. Sometime a tight deadline like this will make things work. Weren't we all waiting for so long on Nachu? In the mean while the little WKT already moved in with plant being built and the open mine pit was excavated. GLA.
- Forums
- ASX - By Stock
- General Discussion Topics
The AAM will involve C4V tech and its design of plant/equipment...
-
- There are more pages in this discussion • 2,481 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
Add MNS (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $50.37M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
MNS (ASX) Chart |
Day chart unavailable