MNS 0.00% 4.2¢ magnis energy technologies ltd

The AAM will involve C4V tech and its design of plant/equipment...

  1. 5,643 Posts.
    lightbulb Created with Sketch. 447
    The AAM will involve C4V tech and its design of plant/equipment so this deadline is not agreed out of the thin air. Sometime a tight deadline like this will make things work. Weren't we all waiting for so long on Nachu? In the mean while the little WKT already moved in with plant being built and the open mine pit was excavated. GLA.
 
watchlist Created with Sketch. Add MNS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.