I think they reached break even on variable costs basis in early December 2023. See graphs in the presentation by CEO at the time.
The recent December 2023 half-yearly muddied that view a bit because it included all the early low volume production from July-October 2023.
I estimate the variable costs are already around $180 per tonne, if not less. The AISC (which includes corporate overheads) is way higher around $200-210 per tonne. Both will decrease as production will increase almost threefold this year.
We'll get an update through the quarterly and a separate update
- Forums
- ASX - By Stock
- General discussion
I think they reached break even on variable costs basis in early...
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXM (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.2¢ |
Change
-0.001(1.89%) |
Mkt cap ! $45.42M |
Open | High | Low | Value | Volume |
5.3¢ | 5.3¢ | 5.1¢ | $28.51K | 546.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.2¢ | 92870 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 0.050 |
2 | 81008 | 0.049 |
3 | 394315 | 0.048 |
1 | 6000 | 0.047 |
1 | 330 | 0.046 |
Price($) | Vol. | No. |
---|---|---|
0.052 | 92870 | 2 |
0.053 | 62189 | 2 |
0.054 | 10000 | 1 |
0.055 | 59236 | 1 |
0.056 | 84000 | 1 |
Last trade - 12.25pm 08/05/2024 (20 minute delay) ? |
|
|||||
Last
5.0¢ |
  |
Change
-0.001 ( 5.66 %) |
|||
Open | High | Low | Volume | ||
5.2¢ | 5.2¢ | 5.0¢ | 63078 | ||
Last updated 12.54pm 08/05/2024 ? |
Featured News
CXM (ASX) Chart |
The Watchlist
HAR
HARANGA RESOURCES LIMITED.
Peter Batten, MD
Peter Batten
MD
Previous Video
Next Video
SPONSORED BY The Market Online