CXM 6.82% 4.7¢ centrex limited

Am I missing something - why the talk about costs?From the...

  1. 75 Posts.
    lightbulb Created with Sketch. 4
    Am I missing something - why the talk about costs?

    From the september quarterly - very roughly:

    -6.366m costs + 0.257m stage 1.5 = -6.109m

    6.109m / 34991 tonnes ore processed etc = $174AUD/tonne processed.

    Now obviously that 6 million number has transport etc in it as well, so its more like a total cost per tonne actually.

    $174AUD / 1.45 = $120 USD / tonne - for breakeven.

    Does this make sense?

    Why would we expect costs to have changed materially from jul-aug-sep? what has happened? Doing the same stuff as Q3; processing, transport etc...



 
watchlist Created with Sketch. Add CXM (ASX) to my watchlist
(20min delay)
Last
4.7¢
Change
0.003(6.82%)
Mkt cap ! $40.28M
Open High Low Value Volume
4.4¢ 4.7¢ 3.6¢ $126.9K 3.080M

Buyers (Bids)

No. Vol. Price($)
1 7507 4.4¢
 

Sellers (Offers)

Price($) Vol. No.
4.7¢ 17922 1
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
CXM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.