Whilst outlined in last Qtrly Report, the following three takeaways from the Africa Downunder presentation by Dale Harris are worth remembering:-
Our engineering design flowsheet for processing graphite concentrate has been optimised to streamline the process. A single flotation stage instead of the original dual design will ascribe significant OPEX and CAPEX savings.
Likewise, the Tanz Govt spend on infrastructure, green grid energy and competitive energy price will reduce OPEX and carbon emissions.
Last, but not least, the locating of our BAM mechanical shaping (which is relatively energy intensive) will save on upfront CAPEX and reduce our carbon footprint.
From 8:30 to 12:20 on the timeline.......
- Forums
- ASX - By Stock
- General Discussion
Whilst outlined in last Qtrly Report, the following three...
-
- There are more pages in this discussion • 743 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EGR (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.0¢ |
Change
-0.001(1.10%) |
Mkt cap ! $40.86M |
Open | High | Low | Value | Volume |
9.1¢ | 9.2¢ | 9.0¢ | $15.81K | 175.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 83968 | 8.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.0¢ | 124578 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 83968 | 0.089 |
4 | 194090 | 0.088 |
2 | 19505 | 0.087 |
1 | 30000 | 0.086 |
1 | 10000 | 0.085 |
Price($) | Vol. | No. |
---|---|---|
0.090 | 124578 | 1 |
0.094 | 50000 | 1 |
0.095 | 50000 | 1 |
0.099 | 58000 | 2 |
0.100 | 278957 | 6 |
Last trade - 15.08pm 04/10/2024 (20 minute delay) ? |
Featured News
EGR (ASX) Chart |