Yes I no all this my point is the project is 16 months over original production date and our shares are getting diluted with all this raising capital with share options. I brought in at 3.1 cents so happy with that but I also bought a load at 3.9 , 4.1 , 4.8, 11.0 , 9 , 8.3 and so on we should have been seeing production by now, lets hope the start of MgO will get LMG back up near 8 to 11 cents.
- Forums
- ASX - By Stock
- general discussion
Yes I no all this my point is the project is 16 months over...
-
- There are more pages in this discussion • 225 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LMG (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.0¢ |
Change
-0.003(4.76%) |
Mkt cap ! $116.1M |
Open | High | Low | Value | Volume |
6.3¢ | 6.5¢ | 6.0¢ | $115.4K | 1.835M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 110500 | 6.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.2¢ | 1274665 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 110500 | 0.060 |
2 | 163000 | 0.059 |
1 | 130399 | 0.058 |
4 | 118736 | 0.057 |
2 | 35000 | 0.055 |
Price($) | Vol. | No. |
---|---|---|
0.062 | 1274665 | 3 |
0.064 | 121000 | 2 |
0.065 | 575524 | 4 |
0.066 | 986557 | 2 |
0.067 | 15380 | 1 |
Last trade - 16.10pm 21/05/2024 (20 minute delay) ? |
|
|||||
Last
6.1¢ |
  |
Change
-0.003 ( 1.61 %) |
|||
Open | High | Low | Volume | ||
6.0¢ | 6.5¢ | 6.0¢ | 437384 | ||
Last updated 15.50pm 21/05/2024 ? |
Featured News
LMG (ASX) Chart |
The Watchlist
ATC
ALTECH BATTERIES LTD
Martin Stein, CFO
Martin Stein
CFO
Previous Video
Next Video
SPONSORED BY The Market Online