hey bud,do you want to do another madness as you are calculating weekly production of p2, let’s calculate how much cash we need until we go full speed.
our current production costs $22m per qtr for p2 which was inclusive of mining activities cost, let say it is roughly $20m per qtr $1.54m per week plus additional employees cost 200k per week total 1.74m. This is our weekly cost for p2
I think p1 is smaller in size and will require less cost for production plus we need less employees, say 70% extra cost $1.218m for p1 roughly
P2 1.74m+$1.218m p = total 2.958
20% mining cost 0.592m =3.55m per week full production costs
weekly cash in $2.154m (currently 28m per qtr)
we need 8weeks window to get additional cash either from mining or p1, so we need to live on existing cash flow from 8 weeks minimum, 3.55-2.154=$1.4mx8= 11.16m
Looks like we need 11.16m + admin and other costs if we start the mining and p1 at the same time and we got 24m
now look at the calculations if we start mining now and put higher grade to p2 and start p1 after 4 or 8 weeks (requires less cash)
or
start p1 now and mining after 4 to 8 weeks ( still requires less cost)
Please check my calculations too.
Note: I think we should take another 10m overdraft facility from thai bank as a safety net though we don’t need it.
- Forums
- ASX - By Stock
- KCN
- General discussion
General discussion, page-3411
-
- There are more pages in this discussion • 1,726 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KCN (ASX) to my watchlist
|
|||||
Last
$1.52 |
Change
0.000(0.00%) |
Mkt cap ! $390.4M |
Open | High | Low | Value | Volume |
$1.53 | $1.53 | $1.49 | $516.7K | 342.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 14976 | $1.52 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.53 | 3182 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 14976 | 1.515 |
1 | 4745 | 1.510 |
1 | 2714 | 1.505 |
1 | 2714 | 1.500 |
2 | 27536 | 1.490 |
Price($) | Vol. | No. |
---|---|---|
1.525 | 3182 | 1 |
1.530 | 9962 | 1 |
1.535 | 3714 | 2 |
1.540 | 2714 | 1 |
1.545 | 1030 | 1 |
Last trade - 16.10pm 30/07/2024 (20 minute delay) ? |
Featured News
KCN (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online