(Old satellite image)
It looks like there's a lag time between mining, to that ore heap, to conveyor, to plant.
eg. Mining, pile up that yellow ore.
- Push it into that first conveyor mouth.
- Conveyor drops or on top of the ore pile.
-The bottom of the pile falls into the chute, up a new conveyor into the plant.
But I don't know how long it takes for the ore pile to do a complete cycle down into the chute (for the top ore to reach the bottom). A day? Weeks?
But the mined ore has to travel from piles, to top of the ore pile, to bottom of the ore pile, to plant.
I'm assuming the pile is 0.4g/t stockpiles, as I think they should announce it if we are processing better grades now.
- Forums
- ASX - By Stock
- KCN
- General discussion
General discussion, page-3920
-
- There are more pages in this discussion • 840 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KCN (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.76 |
Change
0.180(11.4%) |
Mkt cap ! $451.0M |
Open | High | Low | Value | Volume |
$1.68 | $1.80 | $1.68 | $2.656M | 1.518M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 3841 | $1.76 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.77 | 850 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 4640 | 1.755 |
6 | 13257 | 1.750 |
6 | 18376 | 1.745 |
3 | 12149 | 1.740 |
4 | 20322 | 1.735 |
Price($) | Vol. | No. |
---|---|---|
1.765 | 1964 | 2 |
1.770 | 18054 | 2 |
1.775 | 23602 | 3 |
1.780 | 13080 | 2 |
1.785 | 4600 | 1 |
Last trade - 14.25pm 10/05/2024 (20 minute delay) ? |
|
|||||
Last
$1.77 |
  |
Change
0.180 ( 12.2 %) |
|||
Open | High | Low | Volume | ||
$1.69 | $1.80 | $1.69 | 73662 | ||
Last updated 14.44pm 10/05/2024 ? |
Featured News
KCN (ASX) Chart |