(Old satellite image)
It looks like there's a lag time between mining, to that ore heap, to conveyor, to plant.
eg. Mining, pile up that yellow ore.
- Push it into that first conveyor mouth.
- Conveyor drops or on top of the ore pile.
-The bottom of the pile falls into the chute, up a new conveyor into the plant.
But I don't know how long it takes for the ore pile to do a complete cycle down into the chute (for the top ore to reach the bottom). A day? Weeks?
But the mined ore has to travel from piles, to top of the ore pile, to bottom of the ore pile, to plant.
I'm assuming the pile is 0.4g/t stockpiles, as I think they should announce it if we are processing better grades now.
- Forums
- ASX - By Stock
- General discussion
(Old satellite image)It looks like there's a lag time between...
-
- There are more pages in this discussion • 800 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KCN (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.62 |
Change
0.000(0.00%) |
Mkt cap ! $416.2M |
Open | High | Low | Value | Volume |
$1.61 | $1.65 | $1.59 | $1.509M | 935.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 32143 | $1.62 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.62 | 9317 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 32143 | 1.615 |
1 | 3402 | 1.605 |
2 | 4017 | 1.600 |
1 | 3402 | 1.595 |
2 | 22287 | 1.590 |
Price($) | Vol. | No. |
---|---|---|
1.620 | 9317 | 1 |
1.625 | 17000 | 1 |
1.630 | 5322 | 2 |
1.635 | 3402 | 1 |
1.640 | 170007 | 3 |
Last trade - 16.10pm 26/04/2024 (20 minute delay) ? |
|
|||||
Last
$1.63 |
  |
Change
0.000 ( 0.98 %) |
|||
Open | High | Low | Volume | ||
$1.62 | $1.65 | $1.59 | 60783 | ||
Last updated 15.59pm 26/04/2024 ? |
Featured News
KCN (ASX) Chart |