Good images in the video.
A confusing visual though. Some plain red dirt in the stockpiles? But gray rock in the ore pile.
Right one is turning, left one is not turning. And 2 cranes visible, likely working. And the tarp, I guess would be for 'refurbishment in progress'. But mined ore should be easier/faster to achieve than finishing refurbishment in full.
Only 1 ore pile is full. But I guess that's low priority - not taking long to fill it when needed. Red dirt visible in background. It's a bit hard to see the stockpiles in that photo.
A lotus hall rig. Assumed to be Quartz area, with the matching gray rock.
Going for a ride in the unused C pit next to the plant.
A Main, water level unchanged (though makes some sense to delay that CAPEX, if there's surface ore in Quartz)
Quite a few bars for the week (?).
They say 1st anniversary. Of reopening?
- Forums
- ASX - By Stock
- General discussion
Good images in the video.A confusing visual though. Some plain...
-
- There are more pages in this discussion • 773 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KCN (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.85 |
Change
0.055(3.06%) |
Mkt cap ! $480.7M |
Open | High | Low | Value | Volume |
$1.85 | $1.87 | $1.84 | $834.8K | 449.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 8564 | $1.85 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.85 | 3065 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 8809 | 1.845 |
7 | 10680 | 1.840 |
10 | 12820 | 1.835 |
8 | 26205 | 1.830 |
4 | 14225 | 1.825 |
Price($) | Vol. | No. |
---|---|---|
1.850 | 3468 | 10 |
1.855 | 5181 | 5 |
1.860 | 20335 | 6 |
1.865 | 14525 | 3 |
1.870 | 44708 | 8 |
Last trade - 13.10pm 16/05/2024 (20 minute delay) ? |
|
|||||
Last
$1.86 |
  |
Change
0.055 ( 2.59 %) |
|||
Open | High | Low | Volume | ||
$1.86 | $1.87 | $1.84 | 17472 | ||
Last updated 13.28pm 16/05/2024 ? |
Featured News
KCN (ASX) Chart |