Good images in the video.
A confusing visual though. Some plain red dirt in the stockpiles? But gray rock in the ore pile.
Right one is turning, left one is not turning. And 2 cranes visible, likely working. And the tarp, I guess would be for 'refurbishment in progress'. But mined ore should be easier/faster to achieve than finishing refurbishment in full.
Only 1 ore pile is full. But I guess that's low priority - not taking long to fill it when needed. Red dirt visible in background. It's a bit hard to see the stockpiles in that photo.
A lotus hall rig. Assumed to be Quartz area, with the matching gray rock.
Going for a ride in the unused C pit next to the plant.
A Main, water level unchanged (though makes some sense to delay that CAPEX, if there's surface ore in Quartz)
Quite a few bars for the week (?).
They say 1st anniversary. Of reopening?
- Forums
- ASX - By Stock
- General discussion
Good images in the video.A confusing visual though. Some plain...
-
- There are more pages in this discussion • 929 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KCN (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.57 |
Change
-0.015(0.95%) |
Mkt cap ! $405.9M |
Open | High | Low | Value | Volume |
$1.59 | $1.60 | $1.56 | $609.2K | 386.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 497 | $1.65 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.49 | 1959 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 2897 | 1.565 |
1 | 2012 | 1.560 |
4 | 20112 | 1.555 |
8 | 96214 | 1.550 |
5 | 61445 | 1.545 |
Price($) | Vol. | No. |
---|---|---|
1.570 | 20143 | 1 |
1.575 | 3207 | 3 |
1.580 | 17032 | 7 |
1.585 | 10367 | 3 |
1.590 | 4847 | 2 |
Last trade - 15.59pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
$1.57 |
  |
Change
-0.015 ( 1.26 %) |
|||
Open | High | Low | Volume | ||
$1.57 | $1.60 | $1.56 | 17710 | ||
Last updated 15.16pm 14/06/2024 ? |
Featured News
KCN (ASX) Chart |