Very interesting to see the 5 new contracts add $109m in TCV = $2.2m per unit per year. 36% higher than the $1.6m assumption in the prospectus base case. Assuming the maintenance engineer costs are mostly fixed, that could significantly improve the profitability of each machine. It also doesn't account for any upside above the minimum contracted rate...
- Forums
- ASX - By Stock
- General discussion
Very interesting to see the 5 new contracts add $109m in TCV =...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
MTL
Mantle Minerals' Nick Poll talks to HotCopper on finding gold grades up to 3.57g/t at Mt Berghaus
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
Add C79 (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.90 |
Change
-0.160(3.16%) |
Mkt cap ! $563.3M |
Open | High | Low | Value | Volume |
$5.00 | $5.00 | $4.80 | $436.2K | 89.06K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 3810 | $4.88 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.90 | 1406 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 3810 | 4.880 |
1 | 105 | 4.810 |
1 | 80 | 4.800 |
1 | 418 | 4.790 |
1 | 418 | 4.780 |
Price($) | Vol. | No. |
---|---|---|
4.900 | 1406 | 2 |
4.910 | 998 | 2 |
4.920 | 418 | 1 |
4.930 | 418 | 1 |
4.940 | 418 | 1 |
Last trade - 16.10pm 02/08/2024 (20 minute delay) ? |
Featured News
C79 (ASX) Chart |