I'm not confident the company will end up downstream processing in Mali/Africa but think the more likely option is a midstream product like lithium salts (35% LiO). Have a look at what PLS is doing with Calix - waste is removed/remain at the mine site rather than being transported half away around the world. Much lower carbon intensity, higher margin product, reduced transportation costs!
Still a way to go to be proven at scale but hopefully by the time we are looking at stage 2 and 3/4/5it will a feasible option.
Edit - Red Baron beat me to it and in more detail!
- Forums
- ASX - By Stock
- General Discussion
I'm not confident the company will end up downstream processing...
-
-
- There are more pages in this discussion • 9,122 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $605.0M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LLL (ASX) Chart |
Day chart unavailable