Build it and they will come.
I think the biggest lead weight is the location which links LLL to AVZ. Mali, like the DRC is not exactly the best place to operate a globally significant mine.
LLL always has the risk of a black swan event stuffing everything up in Mali. I personally believe the plant will be constructed without any issue and once the cashflow has started to be generated the company will re-rate very very quickly to around $2.5B MC IMO.
- Forums
- ASX - By Stock
- LLL
- General Discussion
General Discussion, page-4710
-
- There are more pages in this discussion • 6,163 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $605.4M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LLL (ASX) Chart |
Day chart unavailable