Jeez that is scary. Using 1% lepidolite ore running at 80% recovery requires 7.5t to get 1t of sc6. Needing approx 10t of sc6 to get 1t LCE at 80% recovery. So 100kt of LCE requires 7.5Mt of ore from lepidolite. Someone will be running a huge loss with a poor end product.
- Forums
- ASX - By Stock
- General Discussion
Jeez that is scary. Using 1% lepidolite ore running at 80%...
-
- There are more pages in this discussion • 1,096 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $605.0M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LLL (ASX) Chart |
Day chart unavailable