Sigma used a ridiculous SC5.5 (?) CIF selling price (US$4000?) for their feasibility. Their CIF cost for DFS was US$523/t, and FOB cost was about US$400/t for SC5.5. Their Sep 2023 FOB cost was higher than DFS FOB cost (not surprising). Their profit margin is likely similar to Goulamina mine (SC6.0).
- Forums
- ASX - By Stock
- LLL
- General Discussion
General Discussion, page-9455
- There are more pages in this discussion • 1,105 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $498.5M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LLL (ASX) Chart |
Day chart unavailable