(27) Post | Feed | LinkedIn
VHM’s flagship Goschen Rare Earths and Mineral Sands Project has reached its first technical review milestone for Phase 1, with the 30% Engineering Design Review undertaken last week. The Review encompassed an overall process and layout review of Phase 1 - Base Process Plant Facility, as well as the critical interfaces with the Hydromet Plant (Phase 1A) and the Non-Process Infrastructure.
This is the first technical assurance review for Phase 1, with subsequent technical reviews planned later in the Detailed Engineering phase which is being executed by Mineral Technologies.
The integrated technical team attending the workshop included technical leads from Mineral Technologies, VHM’s Project Team, as well as other key consultants.
- Forums
- ASX - By Stock
- General Discussion
(27) Post | Feed | LinkedInVHM’s flagship Goschen Rare Earths...
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VHM (ASX) to my watchlist
(20min delay)
|
|||||
Last
45.0¢ |
Change
-0.015(3.23%) |
Mkt cap ! $75.48M |
Open | High | Low | Value | Volume |
47.5¢ | 47.5¢ | 45.0¢ | $13.01K | 28.61K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 5500 | 44.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
45.0¢ | 28040 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 5500 | 0.440 |
1 | 13600 | 0.430 |
1 | 17263 | 0.425 |
2 | 13221 | 0.420 |
2 | 3800 | 0.400 |
Price($) | Vol. | No. |
---|---|---|
0.450 | 28040 | 2 |
0.460 | 16703 | 1 |
0.480 | 120 | 1 |
0.485 | 11000 | 1 |
0.500 | 50000 | 1 |
Last trade - 10.48am 03/10/2024 (20 minute delay) ? |
Featured News
VHM (ASX) Chart |