NRZ 0.00% 1.3¢ neurizer ltd

stages:Stage 1 consists of:1. Construction of gasification wells...

  1. 63 Posts.
    lightbulb Created with Sketch. 7
    stages:
    Stage 1 consists of:

    1. Construction of gasification wells to provide energy (syngas) for the project; and
    2. 5 MW gas fired power generation.

    Stage 2 consists of:
    1.Expansion of gasification fields;
    2.100MW gas fired power generation;
    3.Ammonia facility;
    4.Urea facility; and
    5.Logistics, loading and transport.
 
watchlist Created with Sketch. Add NRZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.