If i was to have a guess. This is it.
Most likely everything to run the camp but not the operation. I would expect to see the generators housed under purpose built sheds and further away from the camp for exhaust and noise pollution.
The two smaller generators for the camp would be run individually, one to supply power and the other as a backup/for maintenance and fueling. The square next to the generators would be a BFI or cool room of some sorts
- Forums
- ASX - By Stock
- General Discussion
If i was to have a guess. This is it.Most likely everything to...
-
- There are more pages in this discussion • 714 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
-0.001(16.7%) |
Mkt cap ! $4.133M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.2¢ | $67.17K | 26.89M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
62 | 81904559 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 24532637 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
62 | 81904559 | 0.002 |
31 | 178091498 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 24532637 | 15 |
0.004 | 6986547 | 10 |
0.005 | 5089671 | 9 |
0.006 | 6435477 | 8 |
0.007 | 385133 | 2 |
Last trade - 14.57pm 07/05/2024 (20 minute delay) ? |
|
|||||
Last
0.2¢ |
  |
Change
-0.001 ( 33.3 %) |
|||
Open | High | Low | Volume | ||
0.3¢ | 0.3¢ | 0.2¢ | 21097185 | ||
Last updated 15.47pm 07/05/2024 ? |
Featured News
NRZ (ASX) Chart |
The Watchlist
HAR
HARANGA RESOURCES LIMITED.
Peter Batten, MD
Peter Batten
MD
Previous Video
Next Video
SPONSORED BY The Market Online