EUR 8.33% 3.9¢ european lithium limited

General Discussion, page-1450

  1. 325 Posts.
    lightbulb Created with Sketch. 44
    On page 44 of the old DFS you can see the timetable showing how long the individual construction phases would take under the most favourable conditions to start production at the end of 2026 if they had started at that time ....

    https://hotcopper.com.au/data/attachments/6326/6326734-7d6f57adf2c1c74c143f830832e16d49.jpg
 
watchlist Created with Sketch. Add EUR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.