GRV 3.70% 2.6¢ greenvale energy ltd

General Discussion, page-137

  1. 137 Posts.
    lightbulb Created with Sketch. 80
    My understanding, also after discussions with Management, is a 30% full cycle yield of the processed product.

    If 500,000 tonnes of ore is mined, there is ~30% waste, leaving 350,000 tonnes to be processed. 350,000 tonnes becomes 105,000 tonnes of bitumen at a 30% recovery rate. (350,000 x 30% = 105,000 tonnes). Presumably, this is the figure GRV will try to improve on.
 
watchlist Created with Sketch. Add GRV (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.