GNX 0.00% 26.5¢ genex power limited

Sideways onthe bottom pit would be unlikely, 1 or even many m...

  1. 139 Posts.
    lightbulb Created with Sketch. 6
    Sideways onthe bottom pit would be unlikely, 1 or even many m deeper might be feasible
    but it lowers head.

    Even the top pit would I expect to be easier to increase by making walls taller not removing and rebuilding them.
    Existing walls leverage natural contours of the land to minimize costs.

    TBMK either is unlikely to be cost-effective given 8hrs is pretty sweet for the duration. And making it more peak MW would mean larger or mroe turbines and no income while it was done.
    Also, The water in the dams if drained would be problematic in terms of contamination from chemicals leachign out of mine walls.

    Better to use one of the other 22000 candidate greenfield sites across Australia and make second one.
 
watchlist Created with Sketch. Add GNX (ASX) to my watchlist
(20min delay)
Last
26.5¢
Change
0.000(0.00%)
Mkt cap ! $367.0M
Open High Low Value Volume
26.5¢ 27.0¢ 26.5¢ $570.5K 2.137M

Buyers (Bids)

No. Vol. Price($)
38 29070836 26.5¢
 

Sellers (Offers)

Price($) Vol. No.
27.0¢ 19026030 161
View Market Depth
Last trade - 16.10pm 07/05/2024 (20 minute delay) ?
Last
26.8¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
26.8¢ 27.0¢ 26.8¢ 2710607
Last updated 15.57pm 07/05/2024 ?
GNX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.