I think 300MW refers to output of the batteries and the 580MWH refers to the total storage capacity of the batteries, so operating at maximum capacity (300MW) it can run for almost two hours before running out of power (580 / 300 ~ 2).
It appears they were using 1M homes as a nice round number, but might have been better served to say 250K homes for two hours (unless somehow the batteries can be discharged at four times the maximum output...).
- Forums
- ASX - By Stock
- General GNX News
I think 300MW refers to output of the batteries and the 580MWH...
-
- There are more pages in this discussion • 877 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GNX (ASX) to my watchlist
|
|||||
Last
27.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $373.9M |
Open | High | Low | Value | Volume |
27.0¢ | 27.3¢ | 27.0¢ | $263.9K | 977.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 11173627 | 27.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
27.5¢ | 5037239 | 38 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
16 | 9673627 | 0.270 |
24 | 11549328 | 0.265 |
3 | 9600 | 0.260 |
2 | 41970 | 0.255 |
1 | 10000 | 0.250 |
Price($) | Vol. | No. |
---|---|---|
0.275 | 4769239 | 35 |
0.280 | 2181148 | 15 |
0.285 | 3170 | 2 |
0.290 | 102719 | 5 |
0.295 | 124962 | 2 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
GNX (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online